Talent Intelligent Agency

Field & hiring resources

Practical tools built from how strong superintendents actually run work. The Lookahead System is available now; the rest are in final review.

For field teams

Superintendent 6-Week Lookahead System

Available

Excel workbook (5 tabs, no macros) + 6-page field guide (PDF)

Plan the next six weeks by trade, flag constraints before they stop work, and print a clean sheet for the coordination meeting.

Look inside: Dashboard, 6-Week Grid, Constraint Log, Collision Matrix, Settings tabs and SOP cover
Real tabs from the workbook
Superintendent 6-Week Lookahead System cover
Cover (illustration)
  • 5 linked tabs: Dashboard, 6-Week Grid (200 activities), Constraint Log, Collision Matrix, Settings
  • Automatic trade collision flags and Friday PPC reliability scoring
  • Formulas locked so they can't be broken; no macros
  • 6-page printable Trade Coordination SOP
  • Works in Excel 2016+ and Google Sheets
$29 instant download
Prefer Etsy? Buy on Etsy →

Change Order & Delay Log

In review

Workbook + guide (PDF)

Log changes and delays the day they happen, with the dates, photos and cost lines a PM needs later.

Subcontractor Mobilization Kit

In review

Checklist + headcount tracker

Confirm each trade is ready before day one and track planned vs. actual crew size.

Field Engineer to Superintendent Guide

In review

Guide (PDF)

The skills, habits and evidence that get field engineers promoted.

For hiring teams

Superintendent Vetting Protocol

In review

Interview scorecard + rubric (PDF)

Structured field questions with 1/3/5 scoring anchors so every interviewer rates candidates the same way.